Quote

From:

11940 N. Lower Sacramento Rd
Lodi, CA 95242

jess@leadingedgedata.com

Quote NumberLE QUO-44
Quote DateSeptember 3, 2026
Valid UntilSeptember 10, 2026
Total$64,304.23
To:
Universal Graphics

2836 Meriwether St.
Las Cruces, NM 88007

PW|fF7^(G*UuSeYPJP0Z275uJ1$UN|FC_UGraphics

SD30 - Received 260903 a RFP for a Base Mail DDU Quote Dems and DTS ONLY, Flat Lowest through rate.

Hrs/QtyServiceRate/PriceSub Total
3Print setup, Mail Data Setup, DDU Setup

Setup services

$25.00$75.00
104755Mail Processing fees

Mail Processing fees -1) NCOA, CASS, Walk Sequencing, Carrier Route, 2)DDU Distribution Report, Conclusion Final Reports. Not Taxable Service

$0.02$1,571.33
104755Printing

8 1/2 x 11, 4/4, full bleed- Mail Not taxable

$0.17$17,703.60
19DDU Shipping Drops

Los Angeles and Orange County Service Not taxable

$100.00$1,900.00
104755Mail House Work

Injet, bundling and entry, and postal entry reports

$0.03$3,142.65
104755Estimated Postage
$0.37$38,759.35
104755Data Cost$0.01$1,152.31
Sub Total$64,304.23
Tax$0.00
Total$64,304.23

Add a comment

Your email address will not be published. Required fields are marked *